lalajee2018
Well-Known Member
- Messages
- 143
- Reaction score
- 6
- Points
- 18
Hi, I have question regrading adr software available time and installation dead line?
If my ADR runs on 10 Aug 2022 at 2pm but I would like updates to be available on friday (12 Aug 2022) and to install updates on Saturday (13 Aug 2022)
Do I need to put available as 3 days and deadline as 1 day?
Can someone please explain how does install/deadline works for software/update install
If my ADR runs on 10 Aug 2022 at 2pm but I would like updates to be available on friday (12 Aug 2022) and to install updates on Saturday (13 Aug 2022)
Do I need to put available as 3 days and deadline as 1 day?
Can someone please explain how does install/deadline works for software/update install