Good evening,
I built my SCCM on Hyper-V Manager , at the beginning I assign 100 GB and now I increased to 150 GB in Hyper-V setting, when I logged in still show me 94.5 GB used and 5.5 GB left . Not sure why it did not show me 150 GB.
Any help I will apricate it
I built my SCCM on Hyper-V Manager , at the beginning I assign 100 GB and now I increased to 150 GB in Hyper-V setting, when I logged in still show me 94.5 GB used and 5.5 GB left . Not sure why it did not show me 150 GB.
Any help I will apricate it